• Open Trail Sections
    • Cross Kirkland Corridor Trail
    • Wilburton Segment
    • Hazelwood to Newcastle Beach Park
    • Eastrail South
    • Willows Road Regional Trail Connection
    • Connection: Totem Lake Connector
    • Newcastle to Coal Creek
    • Bike Lane
  • Future Trails & Projects
    • Future Trail Project: Slater Ave NE HAWK Signal
    • Future Project: Eastrail to Spring Blvd Trail Link
    • Future Trail: to extend all the way into Gene Coulon Memorial Park entrance at Houser Way
    • 145th Crossing
    • I-405 Bridge
    • Future Trail: Connection between Redmond Central Connector and East Lake Sammamish Trail
    • Wilburton Trestle
    • Future Trails / Centennial Trail South
    • Future Trail / Wilburton Segment
    • I-90 Steel Bridge Connection
    • Redmond Central Connector
    • Future Trails / Centennial Trail South
    • Future Trail / Redmond Trail Connector
    • Future Trail / Eastrail South Lake Washington Waterfront
  • Other Trail Systems
    • Sammamish River Trail
    • 520 Trail
    • I-90 Trail
  • Connections
    • NE 8th St. Overcrossing
    • Northup Way Connector trial ramp connects the Eastrail to the 520 Trail Corridor at Northup Way. Opened December 2023.
    • Connection: 120th Ave NE
    • Connection: Mountains to Sound - I-90 Trail
    • Totem Lake Connector
    • Connection: Feriton Spur Park - 7th Ave
    • Connection: Wilburton Station
    • Connection: Sammamish River Trail
    • Connection: South Kirkland Park and Ride and Transit
    • Connection: 108th Ave NE
    • 132nd to 139th
    • Redmond Central Connector
    • Willows to 145th
    • Connection: 120th Ave NE
    • Redmond Central Connector Trail
  • Parks
    • Downtown Park
    • Kennydale Beach Park
    • Gene Coulon Memorial Beach Park
    • Cross Kirkland Corridor Pavilion
    • Terrace Park
    • Crestwoods Park features large soccer and baseball fields, a basketball court, playground picnic area, and restrooms with dirt trails that connect to Eastrail. Portable toilet available from approximately November through March
  • Parking
    • Parking: Designated parking spots along Railroad Street
    • Parking Available
    • Parking: Crestwoods Park
    • Parking Available
    • Parking Available
    • Parking Available
    • Parking Available
    • Parking: Redmond Central Connector Park. Paid parking with first two hours free.
  • Restrooms
    • Downtown Park Restrooms
    • Newcastle Beach Restrooms
    • Terrace Park Restrooms
    • Feriton Spur Restrooms
    • Crestwoods Park Restrooms
    • Kennydale Park Restrooms
    • Gene Coulon Beach Park Restrooms
  • Eastrail System